Go to Milbury Systems Contact us

  • Home
  • Room Solutions
    • Overview
    • FAQ
    • Ten out of Ten
  • Stadia Solutions
  • Retaining Solutions
    • L Walls
    • L & T Walls
    • Rocket Walls
    • Ground Beams
    • FAQs
  • Sectors
    • Hotels
      • Hampton by Hilton
      • Newcastle International Airport Hotel
      • Radisson Blu Hotel
      • Express by Holiday Inn
    • Student Accommodation
      • University of Essex
      • University of Reading
      • University of London - Mile End Road
      • Mason Hall, University of Birmingham
      • Hughenden Park Student Village, High Wycombe
      • University of Abertay
    • Stadiums
      • New Ricoh Arena - Coventry
      • Brit Oval - Kennington
      • Preston North End Football Stadium
      • Olympics Aquatics Centre
    • Retaining
      • Sewage Treatment Works - Minworth
      • Civic Amenity Site - Oadby
  • CPDs
    • CPD Roadshows
  • Our Commitment
    • Sustainability
    • Environmental Policy
    • Health & Safety Policy
  • News
  • About Us
    • About Eleco plc
    • Our Journey
  • Contact Us
Room Solutions Ten out of Ten

1. Design

1. Design

  • Working with you from the beginning, at Bell & Webster
    we pride ourselves in our commitment to providing
    flexible and cost efficient design prior to any concrete
    being poured.

  • Using a combination of Tekla 3D visualisation tools
    and Asta PowerProject management we can ensure
    production times are aligned with the erection to
    provide a 'just in time'
    delivery of units.

  • Each unit is pre designed to ensure relevant
    Building Regulations (Part E & K) are met.



2. Manufacture

2. Manufacture

  • Factory controlled manufacturing ensuring consistent quality and superb finishing
  • Adjustable Moulds allowing for curved walls and any window shape
  • Bolt on and cast in services.  We offer the flexibility to include underfloor heating and electrical fittings can be cast into the panels for improved installation.
  • Direct sourcing of sustainable materials from partners located on the same site

3. Load/Offload

3. Load/Offload

  • Units are lifted and installed direct from the lorry resulting
    in a reduction in site deliveries, noise, waste and traffic.

  • Tracking system for quality control ensuring
    each unit is delivered just in time.

  • Improved safety, load/off-load speed with
    A-Frame cradles.



4. Erection

4. Erection

  • RoomSolutions can be a scaffold-less system, cutting costs, improving erection time and providing better
    safety with less personne and services on site.

  • With precast units being delivered and craned
    into position there is less site traffic allowing
    for construction to progress on sites that have
    limited space.

  • Improved site management and reduced risk
    with fewer operatives on site.

5. Bracing & Positioning

5. Bracing & Positioning

  • Providing a method of securing each unit throughout the erection process, enhancing the speed whilst positioning
    components.

  • Each unit is designed to interlock and align with adjacent
    units providing very quick construction.


6. Grouting & Sealing

6. Grouting & Sealing

  • Working in coordination with the erection team to improve the speed of finishing.

  • Internal works can commence very early and work
    in coordination during the erection process.


7. Pod Installation

7. Pod Installation

  • There is no limit to the size of pods to be accommodated.
  • Bell & Webster now offer sourcing and installation of bathroom pods.

Bathroom and Kitchen pod installation  

8. Slab Installation

8. Slab Insallation

  • Slab or floor/ceiling installation ties the walls together. Prestressed concrete slab installaiton

  • With our prestressing beds we offer spans of up to 8 metres allowing for future proof designs in addition to
    a fast and robust build.


9. Finishing

9. Finishing

  • Internal walls and ceilings are finished to our standard class C finish allowing for direct decoration.

Precast RoomSolutions finishing Finished precast concrete internal walls student accommodation

10. Handover

10. Handover

Engineered, robust and sustainable investment is handed over on time and within the fixed budgeted price.

Student Accommodation Fast Build Concrete system Fast Build Concrete Student Accommodation

 

Room Solutions

  • Overview
  • FAQ
  • Ten Out of Ten

Student Case Studies

  • University of Essex
  • University of Reading
  • University of London, Mile End Road
  • Mason Hall, University of Birmingham
  • Hughenden Park Student Village, High Wycombe
  • University of Abertay

Hotels Case Studies

  • Hampton by Hilton
  • Newcastle International Airport Hotel
  • Radisson Blu Hotel
  • Express by Holiday Inn

Home
About Us
Our Commitment
News and Events
Contact Us
Room Solutions
Stadia Solutions
Retaining Solutions
CPDs
Text Size
Terms & Conditions
Privacy Statement
Like us on Facebook Follow us on Twitter


© Bell & Webster 2011 | Last updated: March 2013